{"id":258,"date":"2017-11-14T20:24:07","date_gmt":"2017-11-14T22:24:07","guid":{"rendered":"https:\/\/camarabrazilecowas.com\/?p=258"},"modified":"2017-12-20T10:58:29","modified_gmt":"2017-12-20T12:58:29","slug":"energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme","status":"publish","type":"post","link":"https:\/\/camarabrazilecowas.com\/en\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/","title":{"rendered":"Energy comission to begin implementation of capital subsidy for rooftop solar PV programme"},"content":{"rendered":"<p>The Ministry of Power, through the Energy Commission, is implementing a Rooftop Solar Photovoltaic (PV) Programme in the country.<!--more--><br \/>\nThe programme is in fulfillment of the President\u2019s Rooftop Solar PV initiative announced in 2015. The primary objective of the programme is to<br \/>\nprovide 200MW peak load relief on the national grid through solar PV technology in the medium term.<\/p>\n<div class=\"text_exposed_show\">\n<p>In order to kick-start the actual implementation of the programme, the Energy Commission has been tasked to facilitate the installation of<br \/>\n20,000 rooftop solar PV systems in residential facilities (homes) under a Capital Subsidy Scheme in 2016.<br \/>\nUnder the programme, a capital subsidy will be given to beneficiaries in two forms, as either:<br \/>\n\u2022 cash payment for solar panels component of the solar PV system; or<br \/>\n\u2022 the supply of actual solar panels after the beneficiary has purchased and installed the requisite Balance of System (BoS) components<br \/>\nsuch as inverter, batteries, charge controllers, etc.<br \/>\nThe maximum capacity of solar panels that will be granted each beneficiary under the programme shall be up to 500Watts.<\/p>\n<p>Who can be a Beneficiary?<br \/>\nThis phase of the Programme is limited to only Residential Facilities (Homes).<\/p>\n<p>Qualification Criteria<br \/>\nProspective beneficiaries shall satisfy the following conditions:<br \/>\n1. Change all lamps in their facility to LED lamps;<br \/>\n2. Be willing to purchase BoS Components;<br \/>\n3. Agree that the installation of the BoS will be done before the supply \/installation of the solar PV panels from the Programme;<br \/>\n4. Install only deep cycle batteries designed for solar PV systems;<br \/>\n5. Ensure that BoS meet the minimum Standards set by Ghana Standards Authority (GSA); and<br \/>\n6. Use only solar PV installers licensed by the Energy Commission for all the installation works.<\/p>\n<p>How to become a Beneficiary<br \/>\n1. Pick an Application Form from the Office of the Energy Commission or its website, fill and submit it;<br \/>\n2. Receive approval of application from the Energy Commission;<br \/>\n3. Obtain a list of accredited solar vendors where BoS must be purchased from the Energy Commission;<br \/>\n4. Purchase the requisite BoS components (batteries, charge controllers, inverter, changeover switch and wires) from an accredited solar vendor of your choice;<br \/>\n5. Invite Energy Commission field officers to come and inspect the installation of the BoS; and<br \/>\n6. Obtain from the Energy Commission solar panels to be coupled to the installed BoS or a cash refund for the cost of the solar panels already purchased and installed, if the criteria is met.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Ministry of Power, through the Energy Commission, is implementing a Rooftop Solar Photovoltaic (PV) Programme in the country.<\/p>\n","protected":false},"author":2,"featured_media":259,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-258","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sem-categoria"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Energy comission to begin implementation of capital subsidy for rooftop solar PV programme - C\u00e2mara de Com\u00e9rcio, Desenvolvimento &amp; Integra\u00e7\u00e3o Brazil - Ecowas<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Energy comission to begin implementation of capital subsidy for rooftop solar PV programme - C\u00e2mara de Com\u00e9rcio, Desenvolvimento &amp; Integra\u00e7\u00e3o Brazil - Ecowas\" \/>\n<meta property=\"og:description\" content=\"The Ministry of Power, through the Energy Commission, is implementing a Rooftop Solar Photovoltaic (PV) Programme in the country.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/\" \/>\n<meta property=\"og:site_name\" content=\"C\u00e2mara de Com\u00e9rcio, Desenvolvimento &amp; Integra\u00e7\u00e3o Brazil - Ecowas\" \/>\n<meta property=\"article:published_time\" content=\"2017-11-14T22:24:07+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-12-20T12:58:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/camarabrazilecowas.com\/wp-content\/uploads\/2017\/11\/14650364_1683045895344193_6960350439480602940_n.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"740\" \/>\n\t<meta property=\"og:image:height\" content=\"244\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"C\u00e2mara\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"C\u00e2mara\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/\"},\"author\":{\"name\":\"C\u00e2mara\",\"@id\":\"https:\/\/camarabrazilecowas.com\/#\/schema\/person\/3f41572af8f2efbade06f5aa56236928\"},\"headline\":\"Energy comission to begin implementation of capital subsidy for rooftop solar PV programme\",\"datePublished\":\"2017-11-14T22:24:07+00:00\",\"dateModified\":\"2017-12-20T12:58:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/\"},\"wordCount\":401,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/camarabrazilecowas.com\/wp-content\/uploads\/2017\/11\/14650364_1683045895344193_6960350439480602940_n.jpg\",\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/\",\"url\":\"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/\",\"name\":\"Energy comission to begin implementation of capital subsidy for rooftop solar PV programme - C\u00e2mara de Com\u00e9rcio, Desenvolvimento & Integra\u00e7\u00e3o Brazil - Ecowas\",\"isPartOf\":{\"@id\":\"https:\/\/camarabrazilecowas.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/camarabrazilecowas.com\/wp-content\/uploads\/2017\/11\/14650364_1683045895344193_6960350439480602940_n.jpg\",\"datePublished\":\"2017-11-14T22:24:07+00:00\",\"dateModified\":\"2017-12-20T12:58:29+00:00\",\"author\":{\"@id\":\"https:\/\/camarabrazilecowas.com\/#\/schema\/person\/3f41572af8f2efbade06f5aa56236928\"},\"breadcrumb\":{\"@id\":\"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/#primaryimage\",\"url\":\"https:\/\/camarabrazilecowas.com\/wp-content\/uploads\/2017\/11\/14650364_1683045895344193_6960350439480602940_n.jpg\",\"contentUrl\":\"https:\/\/camarabrazilecowas.com\/wp-content\/uploads\/2017\/11\/14650364_1683045895344193_6960350439480602940_n.jpg\",\"width\":740,\"height\":244},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/camarabrazilecowas.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Energy comission to begin implementation of capital subsidy for rooftop solar PV programme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/camarabrazilecowas.com\/#website\",\"url\":\"https:\/\/camarabrazilecowas.com\/\",\"name\":\"C\u00e2mara de Com\u00e9rcio, Desenvolvimento & Integra\u00e7\u00e3o Brazil - Ecowas\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/camarabrazilecowas.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/camarabrazilecowas.com\/#\/schema\/person\/3f41572af8f2efbade06f5aa56236928\",\"name\":\"C\u00e2mara\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/3096d442419182799863900b6b7ae9d7ae36ea8f6c0295e06da4cafb480794db?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/3096d442419182799863900b6b7ae9d7ae36ea8f6c0295e06da4cafb480794db?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/3096d442419182799863900b6b7ae9d7ae36ea8f6c0295e06da4cafb480794db?s=96&d=mm&r=g\",\"caption\":\"C\u00e2mara\"},\"url\":\"https:\/\/camarabrazilecowas.com\/en\/author\/ecowas\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Energy comission to begin implementation of capital subsidy for rooftop solar PV programme - C\u00e2mara de Com\u00e9rcio, Desenvolvimento & Integra\u00e7\u00e3o Brazil - Ecowas","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/","og_locale":"pt_BR","og_type":"article","og_title":"Energy comission to begin implementation of capital subsidy for rooftop solar PV programme - C\u00e2mara de Com\u00e9rcio, Desenvolvimento & Integra\u00e7\u00e3o Brazil - Ecowas","og_description":"The Ministry of Power, through the Energy Commission, is implementing a Rooftop Solar Photovoltaic (PV) Programme in the country.","og_url":"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/","og_site_name":"C\u00e2mara de Com\u00e9rcio, Desenvolvimento & Integra\u00e7\u00e3o Brazil - Ecowas","article_published_time":"2017-11-14T22:24:07+00:00","article_modified_time":"2017-12-20T12:58:29+00:00","og_image":[{"width":740,"height":244,"url":"https:\/\/camarabrazilecowas.com\/wp-content\/uploads\/2017\/11\/14650364_1683045895344193_6960350439480602940_n.jpg","type":"image\/jpeg"}],"author":"C\u00e2mara","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"C\u00e2mara","Est. tempo de leitura":"2 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/#article","isPartOf":{"@id":"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/"},"author":{"name":"C\u00e2mara","@id":"https:\/\/camarabrazilecowas.com\/#\/schema\/person\/3f41572af8f2efbade06f5aa56236928"},"headline":"Energy comission to begin implementation of capital subsidy for rooftop solar PV programme","datePublished":"2017-11-14T22:24:07+00:00","dateModified":"2017-12-20T12:58:29+00:00","mainEntityOfPage":{"@id":"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/"},"wordCount":401,"commentCount":0,"image":{"@id":"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/#primaryimage"},"thumbnailUrl":"https:\/\/camarabrazilecowas.com\/wp-content\/uploads\/2017\/11\/14650364_1683045895344193_6960350439480602940_n.jpg","inLanguage":"pt-BR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/","url":"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/","name":"Energy comission to begin implementation of capital subsidy for rooftop solar PV programme - C\u00e2mara de Com\u00e9rcio, Desenvolvimento & Integra\u00e7\u00e3o Brazil - Ecowas","isPartOf":{"@id":"https:\/\/camarabrazilecowas.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/#primaryimage"},"image":{"@id":"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/#primaryimage"},"thumbnailUrl":"https:\/\/camarabrazilecowas.com\/wp-content\/uploads\/2017\/11\/14650364_1683045895344193_6960350439480602940_n.jpg","datePublished":"2017-11-14T22:24:07+00:00","dateModified":"2017-12-20T12:58:29+00:00","author":{"@id":"https:\/\/camarabrazilecowas.com\/#\/schema\/person\/3f41572af8f2efbade06f5aa56236928"},"breadcrumb":{"@id":"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/"]}]},{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/#primaryimage","url":"https:\/\/camarabrazilecowas.com\/wp-content\/uploads\/2017\/11\/14650364_1683045895344193_6960350439480602940_n.jpg","contentUrl":"https:\/\/camarabrazilecowas.com\/wp-content\/uploads\/2017\/11\/14650364_1683045895344193_6960350439480602940_n.jpg","width":740,"height":244},{"@type":"BreadcrumbList","@id":"https:\/\/camarabrazilecowas.com\/energy-comission-to-begin-implementation-of-capital-subsidy-for-rooftop-solar-pv-programme\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/camarabrazilecowas.com\/"},{"@type":"ListItem","position":2,"name":"Energy comission to begin implementation of capital subsidy for rooftop solar PV programme"}]},{"@type":"WebSite","@id":"https:\/\/camarabrazilecowas.com\/#website","url":"https:\/\/camarabrazilecowas.com\/","name":"C\u00e2mara de Com\u00e9rcio, Desenvolvimento & Integra\u00e7\u00e3o Brazil - Ecowas","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/camarabrazilecowas.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Person","@id":"https:\/\/camarabrazilecowas.com\/#\/schema\/person\/3f41572af8f2efbade06f5aa56236928","name":"C\u00e2mara","image":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/secure.gravatar.com\/avatar\/3096d442419182799863900b6b7ae9d7ae36ea8f6c0295e06da4cafb480794db?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/3096d442419182799863900b6b7ae9d7ae36ea8f6c0295e06da4cafb480794db?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3096d442419182799863900b6b7ae9d7ae36ea8f6c0295e06da4cafb480794db?s=96&d=mm&r=g","caption":"C\u00e2mara"},"url":"https:\/\/camarabrazilecowas.com\/en\/author\/ecowas\/"}]}},"_links":{"self":[{"href":"https:\/\/camarabrazilecowas.com\/en\/wp-json\/wp\/v2\/posts\/258","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/camarabrazilecowas.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/camarabrazilecowas.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/camarabrazilecowas.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/camarabrazilecowas.com\/en\/wp-json\/wp\/v2\/comments?post=258"}],"version-history":[{"count":0,"href":"https:\/\/camarabrazilecowas.com\/en\/wp-json\/wp\/v2\/posts\/258\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/camarabrazilecowas.com\/en\/wp-json\/wp\/v2\/media\/259"}],"wp:attachment":[{"href":"https:\/\/camarabrazilecowas.com\/en\/wp-json\/wp\/v2\/media?parent=258"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/camarabrazilecowas.com\/en\/wp-json\/wp\/v2\/categories?post=258"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/camarabrazilecowas.com\/en\/wp-json\/wp\/v2\/tags?post=258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}